TERMINATION LOG: SITE-96 INCIDENT REPORT

Termination Log: Site-96 Incident Report

Termination Log: Site-96 Incident Report

Blog Article

The following log details the termination procedures undertaken at Site-96 on designated day Zeta. The primary objective of the operation was to neutralize a subject classified as Safe designation. Initial reports indicate that the termination protocol was unsuccessful with minimal collateral damage. Subject containment breach occurred at approximately 02:59 local time. Further investigation into the incident's origin is ongoing.

  • Key contributors to termination process: Dr.Last Name Redacted, Dr.Last Name Redacted, AgentID number Redacted.
  • Methods of containment used: M-Class weaponry, PKE meter.

Full report pending security clearance level 5 access.

Euclid Containment Breach - Site 96

On 04/23/YY| During early hours, an anomaly occurred at Site 96, resulting in the breach of Euclid-class entity SCP-YYY. Initial reports indicate a containment failure as the primary cause. Security personnel were immediately dispatched to the affected area and engaged in a tactical evacuation.

  • The breached entity exhibited altered behavior patterns, posing a potential threat to surrounding infrastructure and personnel.
  • Standard operating guidelines were implemented with varying degrees of success. Further investigation into the cause of the breach is ongoing, with on-site technicians currently at work.
  • Public disclosure| The Foundation has issued a official press release outlining the containment procedures.

Designation Delta-7 : Site 96 Protocol Engaged

An unknown entity has been detected within the perimeter. All personnel are to assume combat positions and await further directives.

Designation Delta-7 is to engage {Site Ninety Six Protocol{ immediately. All capabilities are to be allocated as needed.

  • Maintain radio silence unless absolutely necessary.
  • Report all observations immediately.
  • Be on guard at all times. This is a level 5 emergency.

Analysis of Site-96 Anomalies

A comprehensive assessment of the anomalous phenomena at Site-96 has been finalized. The lead findings indicate a complex and mutable system exhibiting traits consistent with paraconsistent activity. Additional research is required to define the nature and purpose of this anomaly.

  • Significant observations:
  • Unexplained electromagnetic anomalies
  • Displaced coordinates
  • Undecipherable signals

Proposed actions include further observation check here of the site and deployment of a dedicated research team. Emergency response plans should be reviewed to reflect the evolving status of this anomaly.

Secure Zone Alpha-2: Site 96 Perimeter Lockdown

A total lockdown has been implemented within Secure Zone Alpha-2, specifically at Site 96. All personnel are to be confined to designated safe areas and avoid all non-essential functions. External access to the site has been strictly prohibited. Any unauthorized individuals attempting to breach the perimeter will be dealt with according to protocol.

Initial reports indicate a potential hazard. The situation is being closely scrutinized by security forces, and updates will be provided as they become available.

Remain calm, follow all instructions from authorized personnel, and cooperate fully with the ongoing investigation.

Examination into Anomalous Signal Originating from Site-96

Preliminary assessment of the anomalous signal detected at Site-96 indicates a probable source originating from deep within the structure. The signal, characterized by irregular modulations in electromagnetic range, has exhibited distinct intensity surges at specific harmonics. Attempts are currently underway to identify the exact location of the signal and determine its type. A group of specialist researchers, including cryptographers, physicists, and anomalous scientists, have been assigned to Site-96 to conduct a thorough investigation.

  • Preliminary findings suggest the signal may be man-made, though more research is required for establishment.
  • Security protocols at Site-96 have been increased in light of the anomalous event.
  • Admission to the site is currently denied to authorized personnel only.

Report this page